A methods and measurements analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse. In a preliminary study, she observed one of her workers perform this task six times with the following results:  Observation 123456 Time (seconds)  463840344240\begin{array} { l r r r r r r } \text { Observation } & 1 & 2 & 3 & 4 & 5 & 6 \\\hline \text { Time (seconds) } & 46 & 38 & 40 & 34 & 42 & 40\end{array} What is the observed time for this task?


A) 34 seconds
B) 40 seconds
C) 46 seconds
D) 48 seconds
E) 240 seconds

F) None of the above
G) C) and D)

Correct Answer

verifed

verified

One of the potential benefits of self-directed teams is higher quality.

A) True
B) False

Correct Answer

verifed

verified

A behavioral approach to job design which increases responsibility for planning and coordinating tasks is job:


A) enlargement.
B) rotation.
C) enrichment.
D) involvement.
E) enhancement.

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

A time study of a job produced the following: average cycle time = 1.5 minutes, performance rating = 1.15. Allowances are 18 percent of the workday (480 minutes). Determine the standard time for this job.

Correct Answer

verifed

verified

\[\begin{array} { l l }
\mathrm { OT } ...

View Answer

Given the following work sampling data, based upon 100 random observations of a particular worker:  Activity  Times Observed  A 20 B 50 C 10 Others 20\begin{array} { l c } \text { Activity } & \text { Times Observed } \\\hline \text { A } & 20 \\\text { B } & 50 \\\text { C } & 10 \\\text { Others } & 20\end{array} What is the estimated proportion of time this worker spends performing activity A?

Correct Answer

verifed

verified

Given the following work sampling data, based upon 100 random observations of a particular worker:  Activity  Times Observed  A 20 B 50 C 10 Others 20\begin{array} { l c } \text { Activity } & \text { Times Observed } \\\hline \text { A } & 20 \\\text { B } & 50 \\\text { C } & 10 \\\text { Others } & 20\end{array} For a confidence level of 86.64 percent, what is the maximum error of the estimate for activity B?

Correct Answer

verifed

verified

The symbols for operation, storage, transportation, inspection, and delay would usually be found on which type of chart?


A) flow process
B) Gantt
C) simultaneous motion
D) worker-machine
E) delay analysis

F) All of the above
G) C) and E)

Correct Answer

verifed

verified

The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.

A) True
B) False

Correct Answer

verifed

verified

When performing a time study, the analyst converts the observed time into the time an "average" worker would require working at an acceptable pace by using which of the following?


A) allowance factors
B) MTM
C) methods analysis
D) performance rating
E) analysis of therbligs

F) C) and D)
G) B) and E)

Correct Answer

verifed

verified

A performance rating of less than 1.0 means that the observed worker was judged to be working at a faster than normal rate-doing the job more quickly than normal.

A) True
B) False

Correct Answer

verifed

verified

Eight instances of a worker doing a task were observed as follows:  Observation 12345678 Time (seconds) 1718151413151612\begin{array} { l r r r r r r r r } \text { Observation } & 1 & 2 & 3 & 4 & 5 & 6 & 7 & 8 \\\hline \text { Time (seconds) } & 17 & 18 & 15 & 14 & 13 & 15 & 16 & 12\end{array} If the person observed worked at a pace that is 80 percent of normal, and if the appropriate allowance for this task is 25 percent of job time, what should be the standard time?

Correct Answer

verifed

verified

A work sampling study of kitchen help is to be designed. The study will be conducted over a nine-day period. The kitchen help works a seven-hour shift. Determine the day, hour, and minute of five observations using the random digits listed below.  Day 18441123190873 Hour 73847913249635 Minute 7132137435268748595011221364\begin{array} { l r r r r r r r r r r r r r r } \text { Day } & 1 & 8 & 4 & 4 & 1 & 1 & 2 & 3 & 1 & 9 & 0 & 8 & 7 & 3 \\\text { Hour } & 7 & 3 & 8 & 4 & 7 & 9 & 1 & 3 & 2 & 4 & 9 & 6 & 3 & 5 \\\text { Minute } & 71 & 32 & 13 & 74 & 35 & 26 & 87 & 48 & 59 & 50 & 11 & 22 & 13 & 64\end{array} Arrange observations chronologically.

Correct Answer

verifed

verified


The observations will occur o...

View Answer

A disadvantage of teams is:


A) higher quality.
B) higher productivity.
C) greater worker satisfaction.
D) team member conflict.
E) lower turnover.

F) B) and D)
G) B) and C)

Correct Answer

verifed

verified

The manager of Lawn and Garden Services would like to estimate the proportion of her employees' time spent performing various gardening and lawn care activities. She has made 400 random observations of a typical worker, with the following results:  Activity  Times Observed  Mowing 200 Trimming 80 Raking 40 Miscellaneous 80\begin{array} { l r } \text { Activity } & \text { Times Observed } \\\hline \text { Mowing } & 200 \\\text { Trimming } & 80 \\\text { Raking } & 40 \\\text { Miscellaneous } & 80\end{array} What is the probability that the true proportion of time spent mowing is exactly equal to the sample proportion?


A) 0
B) .1
C) .2
D) .5
E) 1

F) B) and D)
G) C) and D)

Correct Answer

verifed

verified

One potential disadvantage of self-directed teams is higher training costs.

A) True
B) False

Correct Answer

verifed

verified

A simo chart includes:


A) delay.
B) storage.
C) transportation.
D) left/right hand movements.
E) inspection.

F) B) and E)
G) All of the above

Correct Answer

verifed

verified

A major advantage of job specialization in business is increased:


A) motivation.
B) opportunity for advancement.
C) opportunity for self-fulfillment.
D) productivity.
E) job enrichment.

F) B) and E)
G) B) and C)

Correct Answer

verifed

verified

A methods and measurements analyst for Timepiece, Inc., needs to develop a time standard for the task of attaching a watch to a wristband. In a preliminary study, he observed one of his workers perform this task five times, with the following results:  Observation 12345 Time (seconds)  2719202113\begin{array} { l r r r r r } \text { Observation } & 1 & 2 & 3 & 4 & 5 \\\hline \text { Time (seconds) } & 27 & 19 & 20 & 21 & 13\end{array} What is the observed time for this task?


A) 20 seconds
B) 27 seconds
C) 46 seconds
D) 66 seconds
E) 100 seconds

F) B) and C)
G) A) and E)

Correct Answer

verifed

verified

Which of the following is not an advantage of time-based pay systems?


A) labor cost stability
B) incentives to increase output
C) ease of administration
D) stability of output
E) ease of pay computations

F) C) and D)
G) C) and E)

Correct Answer

verifed

verified

A worker-machine chart can help identify nonproductive parts of a process.

A) True
B) False

Correct Answer

verifed

verified